Forums65
Topics76,460
Posts1,033,932
Members14,835
|
Most Online44,182 Mar 18th, 2025
|
|
10 members (Alanbentley, 3 invisible),
8,453
guests, and
610
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
M |
T |
W |
T |
F |
S |
S |
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
30
|
|
|
|
|
|
|
Joined: Oct 2010
Posts: 7
Beginner
|
OP
Beginner
Joined: Oct 2010
Posts: 7 |
Does anyone know what is going on to left of the Station Road if you are travelling from Storeton/Lever Causeway towards Barnston? A new road entrance has been created and it looks like something substantial is being built.
Thanks
|
|
|
|
Joined: Mar 2010
Posts: 4,044
Forum Guardian
|
Forum Guardian
Joined: Mar 2010
Posts: 4,044 |
A barn ? cant see much in the planning applications so may be something to do with the new elecy cable just by station house
|
|
|
|
Joined: Jun 2011
Posts: 17,809 Likes: 3
Wiki Master
|
Wiki Master
Joined: Jun 2011
Posts: 17,809 Likes: 3 |
Is it likely to be connected to the underground cables stretching across Wirral? From Landican there are various in roads being made across fields They have crossed over Landican Lane, Whitehouse Lane and continuing . I assume it must have crossed Station Road also.
Last edited by granny; 27th May 2014 9:29pm.
Humankind has not woven the web of life. We are but one thread within it. Whatever we do to the web, we do to ourselves. All things are bound together. All things connect. ~Chief Seattle
|
|
|
|
Joined: Jun 2009
Posts: 1,024
Forum Guide
|
Forum Guide
Joined: Jun 2009
Posts: 1,024 |
Under ground DC cable from Scotland to Flint Power station, if you use any of the roads across it's route they have the same setup.
|
|
|
|
Joined: Oct 2010
Posts: 7
Beginner
|
OP
Beginner
Joined: Oct 2010
Posts: 7 |
|
|
|
|
Joined: Feb 2013
Posts: 19
Newbeee
|
Newbeee
Joined: Feb 2013
Posts: 19 |
Why did they not take this cable up the river Dee instead of spoiling parts of the Wirral, After all we can lay cable across the Atlantic..?
|
|
|
|
Joined: Oct 2007
Posts: 4,868
Forum Veteran
|
Forum Veteran
Joined: Oct 2007
Posts: 4,868 |
Why did they not take this cable up the river Dee instead of spoiling parts of the Wirral, After all we can lay cable across the Atlantic..? That's a very good question. Because that idea looks sensible, there must be a good technical reason why not. I hope someone knows the answer.
Carpe diem.
|
|
|
|
Joined: Nov 2009
Posts: 143
Enthusiast
|
Enthusiast
Joined: Nov 2009
Posts: 143 |
In planning, designing and constructing the Western Link we aim to minimise disturbance to communities and the environment.
One of our initial ideas was to route the cable through the Dee Estuary as it is the most direct route, but this was not feasible. The movement of the sand on the bed of the river and the use of the estuary by shipping increased the possibility that the cable would not work properly or would be damaged. Also, the Dee Estuary is classed as an area of high environmental importance. (from the project website at http://www.westernhvdclink.co.uk/qanda.aspx)
|
|
|
Click to View Topic.
|
|